
The sales‑office demonstration‑areas of Zhoukou Shenghua‑City and Zhengzhou Vanke‑City serve as the front‑image‑display windows for two real‑estate‑projects. Adopting large‑span special‑shaped steel‑frame system, the sales‑buildings create spacious open lobby, sand‑table exhibition‑zone, customer‑negotiation‑area and supporting space for show‑flats. With advantages of light‑self‑weight, flexible‑shaping and fast‑construction‑speed, steel‑structure realizes diverse cantilever‑structures, curved‑roofs and wide‑column‑free‑space, perfectly meeting modern‑design requirements of real‑estate‑marketing‑buildings, accelerating demonstration‑area opening‑schedule and shortening pre‑construction‑period.
As special‑shaped decorative steel‑structure projects with abundant cantilever‑members, major construction‑challenges include lofting‑fabrication of irregular steel‑components, high‑altitude positioning of long‑span cantilever‑steel‑beams, high‑precision connection of beam‑column‑joints, cross‑construction for multi‑zone show‑flat steel‑works and accurate layout of embedded‑parts for subsequent‑decoration. Located in Central‑Henan with distinct‑four‑seasons, hot‑rainy summers and specified winter‑snow‑load, all primary‑secondary steel‑members adopt hot‑dip‑galvanization plus finish‑coating anti‑corrosion‑system against damp‑dry‑alternating erosion. The steel‑frame is calculated in accordance with seismic‑code for public‑buildings to guarantee long‑term‑safe‑operation. BIM‑simulation is applied for pre‑assembly of special‑shaped members and clash‑detection to deliver projects on schedule.
We undertook full‑scope steel‑structure construction for the two sales‑office demonstration‑areas, covering detailed‑design of irregular‑steel‑frame, factory‑prefabrication of H‑section‑steel‑columns‑and‑beams, shot‑blasting anti‑corrosion‑coating, foundation‑re‑survey, hoisting‑erection of steel‑columns, assembly‑lifting of cantilever‑beams, high‑strength‑bolt tightening & welding, mezzanine‑steel‑work for show‑flats, elevation‑&‑verticality‑calibration, supplementary fire‑&‑anti‑corrosion painting and installation of decorative embedded‑parts. Strict quality‑control was implemented for special‑shaped‑component‑precision, cantilever‑beam‑erection quality and weld‑non‑destructive‑testing. We delivered high‑quality steel‑works and laid a solid foundation for subsequent curtain‑wall and interior‑decoration.
